File #: 24-205    Version: 1
Type: Flood Control District Status: Agenda Ready
File created: 3/28/2024 In control: FLOOD CONTROL DISTRICT
On agenda: 4/10/2024 Final action:
Title: CONTINUATION OF STORM DRAIN EMERGENCY REPAIR IN THE UNINCORPORATED COMMUNITIES OF CASA DE ORO, LAKESIDE AND FALLBROOK [FUNDING SOURCE: AVAILABLE PRIOR YEAR FLOOD CONTROL DISTRICT FUND FUND BALANCE] (4 VOTES)
Attachments: 1. FCD All Emergency Projects Board Letter 04102024 Final Version, 2. Agenda Information Sheet Emergency Repair 04102024 Signed v1, 3. Continued Emergency FC COSD BOARD LETTER APPROVAL LOG signed, 4. 04102024 FL01 Minute Order, 5. 04102024 FL01 Speakers, 6. 04102024 FL01 Ecomments

DATE:

April 10, 2024

FL01

                                                                                                                                                   

TO:

Flood Control District Board of Directors

 

SUBJECT

CONTINUATION OF STORM DRAIN EMERGENCY REPAIR IN THE UNINCORPORATED COMMUNITIES OF CASA DE ORO, LAKESIDE AND FALLBROOK (DISTRICTS: 2, 4 AND 5)

Title

 

Body

OVERVIEW

On January 22, 2024, the County experienced catastrophic flooding in the Spring Valley area from an extremely rare storm event. Based on a statistical analysis of historical rainfall records at this location, staff determined that the amount of rain that fell on the 22nd was considered an unprecedented storm event, an event that has a 0.1% chance of occurring in that location in any given year. Other areas of the County also experienced heavy rain and flooding.

 

Existing drainage infrastructure is not designed to convey stormwater flows from an event of this magnitude. Flood Control District-maintained facilities at the following eight locations were impacted and required immediate emergency response:

 

                     1243 & 1247 Purdy Street, Spring Valley, CA 91977

                     2117 Ildica Court, Spring Valley, CA 91977

                     9602 Casa de la Torre Court, Casa de Oro, CA 91977

                     3150 Rio Way, Spring Valley, CA 91977

                     4362 & 4368 Edgewood Court, Casa de Oro, CA 91941

                     9825 Dogwood Lane, Hidden Meadows, CA 92026

                     8575 Los Coches Road, Lakeside, CA 92021

                     2544 Buena Flores, Fallbrook, CA 92028

 

In accordance with County Administrative Code Section 402, “Emergency Preparedness,” notices to proceed were issued to repair or replace damaged storm drains and any other related drainage facilities and remove mud and debris. 

 

 

 

On March 13, 2024 (FL01), the County Board of Supervisors, acting as the Board of Directors of the San Diego County Flood Control District (Board), found there was a need for the emergency repair for ongoing projects located in Spring Valley, Casa de Oro and Lakeside, ratified one new emergency contract for a project located in Fallbrook, and provided authorization to continue with ongoing emergency work. Projects located at Purdy Street in Lakeside, Ildica Court in Spring Valley and Dogwood Lane in Hidden Meadows were completed before the hearing date. Pursuant to Public Contract Code section 22050, until the repairs are completed, the Board is required to determine at every regular scheduled Board meeting that there is a need to continue the emergency work.

 

Following the Board hearing on March 13, 2024, an additional (ninth) impacted  storm drain located at 402 Potter Street in Fallbrook was identified as requiring emergency repair. An emergency contract to repair failed and clogged drainage structures at 402 Potter Street in Fallbrook was authorized. The total cost of emergency repairs (for all projects) has increased by an additional $500,000 with the addition of the 402 Potter Street project. Construction costs for all listed emergency repairs is currently estimated at $5.85 million.

 

As of the March 18, 2024, the following five projects had been completed:

 

                      2117 Ildica Court, Spring Valley, CA 91977

                      9825 Dogwood Lane, Hidden Meadows, CA 92026

                      1243 & 1247 Purdy Street, Spring Valley, CA 91977

                      3150 Rio Way, Spring Valley, CA 91977

                      9602 Casa de la Torre Court, Casa de Oro, CA 91977

 

 

Today’s request is for the Board to find that there is a need to continue the emergency repair work at the first three locations identified immediately below in accordance with Public Contract Code section 22050 and seeks ratification of the newly-awarded emergency contract for 402 Potter Street in accordance with County Administrative Code section 402. Ratification pursuant to County ordinances is sought because the District uses County ordinances.

 

                      4362 & 4368 Edgewood Court, Casa de Oro, CA 91941

                      8575 Los Coches Road, Lakeside, CA 92021

                      2544 Buena Flores, Fallbrook, CA 92028

                      402 Potter Street, Fallbrook, CA 92028

 

The first three emergency contracts listed above were previously ratified by the Board at the February 7, February 28, and March 13, 2024, hearings, and additional ratification for those is unnecessary.  

 

 

 

RECOMMENDATION(S)

CHIEF ADMINISTRATIVE OFFICER

1.                     Find the proposed projects are statutorily exempt from California Environmental Quality Act (CEQA) review pursuant to Section 15269(b) of the CEQA Guidelines because the proposed projects involve emergency repairs to publicly owned service facilities necessary to maintain service essential to the public health, safety or welfare.

 

2.                     Pursuant to Public Contract Code section 22050(c)(2), find that there is a need to continue the emergency sinkhole repair, clog removal and sediment/debris removal at the three locations in Casa de Oro (1 locations), Lakeside (1 location) and Fallbrook (1 location) identified in this Board letter without giving notice for bids to let a contract. (4 VOTES)

 

3.                     Pursuant to Public Contract Code section 22050(b)(3), receive the report for the emergency work at Potter Street in Fallbrook as set forth in this Board letter detailing that the need for emergency sinkhole repair at this location did not permit the delay that would otherwise result from competitive solicitations for bids.

 

4.                     Pursuant to Section 402 of the County Administrative Code, ratify the contract with Hazard Construction Engr LLC for the emergency repair work at Potter Street in Fallbrook on the basis that the public interest and necessity demanded immediate expenditure of funds on an emergency basis without competitive bidding.

 

5.                     Establish appropriations of $500,000 in the Department of Public Works, Flood Control District, Services & Supplies, for emergency repairs at the Potter Street location in Fallbrook based on available prior year Flood Control District Fund fund balance.         (4 VOTES)

 

 

EQUITY IMPACT STATEMENT

The failed storm drains are publicly maintained facilities that convey rainfall runoff and flood waters off the roadways and properties in the immediate vicinity. The San Diego County Flood Control District is responsible for the continued maintenance and proper function of the storm drain system in these areas. Approval of the emergency work will provide an overall benefit to the members of the residential communities and to those who use the public roads in the areas. 

 

SUSTAINABILITY IMPACT STATEMENT

The emergency work will contribute to health and wellbeing sustainability benefits. The projects will reduce the risk to life and property by restoring the proper function of the storm drain system to convey runoff and flood waters, which will contribute to County of San Diego sustainability goals of protecting the health and wellbeing of everyone in the region.

 

 

 

 

FISCAL IMPACT

Funds for this request are partially included in the Fiscal Year (FY) 2023-24 Operational Plan for the Flood Control District (District). If approved, this request will result in additional costs and revenue of $500,000 tied to recommendation five, for a total cost of $5,850,000 in FY 2023-24. The funding source is available prior year Flood Control District Fund fund balance. There will be no change in net General Fund cost and no additional staff years.

 

BUSINESS IMPACT STATEMENT

N/A

 

ADVISORY BOARD STATEMENT

N/A

 

BACKGROUND

On January 22, 2024, the County experienced catastrophic flooding in the Spring Valley area from an extremely rare storm event. Based on a statistical analysis of historical rainfall records at this location, staff determined that the amount of rain that fell on the 22nd was considered an unprecedented storm event, an event that has a 0.1% chance of occurring in that location in any given year. Other areas of the County also experienced heavy rain and flooding.

 

Existing drainage infrastructure is not designed to convey stormwater flows from an event of this magnitude, and Flood Control District-maintained facilities at the following eight locations were impacted and required immediate emergency response:

 

                     1243 & 1247 Purdy Street, Spring Valley, CA 91977

                     2117 Ildica Court, Spring Valley, CA 91977

                     9602 Casa de la Torre Court, Casa de Oro, CA 91977

                     3150 Rio Way, Spring Valley, CA 91977

                     4362 & 4368 Edgewood Court, Casa de Oro, CA 91941

                     9825 Dogwood Lane, Hidden Meadows, CA 92026

                     8575 Los Coches Road, Lakeside, CA 92021

                     2544 Buena Flores, Fallbrook, CA 92028

 

 

In accordance with County Administrative Code section 402, “Emergency Preparedness,” notices to proceed with emergency repairs were issued to repair or replace damaged storm drains and any other related drainage facilities and remove the mud and debris. 

 

 

 

 

 

 

On March 13, 2024 (FL01), the County Board of Supervisors, acting as the Board of Directors of the San Diego County Flood Control District (Board), found there was a need for the emergency repair for ongoing projects located in Spring Valley, Casa de Oro and Lakeside, ratified one new emergency contract for the project in Fallbrook and provided authorization to continue with ongoing emergency work.  Projects located at Purdy Street in Lakeside, Ildica Court in Spring Valley and Dogwood Lane in Hidden Meadows were completed before the hearing date. Pursuant to Public Contract Code section 22050, until the repairs are completed, the Board is required to determine at every regular scheduled Board meeting that there is a need to continue the emergency action.

 

Following the Board hearing on March 13, 2024, an additional (ninth) impacted storm drain was identified as requiring emergency repair. An emergency contract to repair failed and clogged drainage structures at 402 Potter Street in Fallbrook was authorized. The total cost of emergency repairs (for all projects) has increased by an additional $500,000 with the addition of the 402 Potter Street project. Construction costs for all listed emergency repairs is currently estimated at $5.85 million.

 

As of March 18, 2024, the following five projects had been completed:

 

                     2117 Ildica Court, Spring Valley, CA 91977

                     9825 Dogwood Lane, Hidden Meadows, CA 92026

                     1243 & 1247 Purdy Street, Spring Valley, CA 91977

                     3150 Rio Way, Spring Valley, CA 91977

                     9602 Casa de la Torre Court, Casa de Oro, CA 91977

 

Emergency Project Summaries

On January 23, 2024, the District was notified that multiple sinkholes formed at 1243 Purdy Street within the unincorporated community of Spring Valley, California.  The sinkholes were caused by the failure of an existing 18-inch corrugated metal storm drainpipe that travels along the shared property line between 1243 and 1247 Purdy Street. The storm drain serves as a means of conveying captured storm flows from Jamacha Road and then releasing them onto Purdy Street.  The site and facility needed immediate stabilization and repair.  The estimated cost for the required work is $300,000. The project was completed on March 11, 2024. 

 

On January 24, 2024, the District was notified that a sinkhole formed at 2117 Ildica Court within the unincorporated community of Spring Valley, California.  This sinkhole was caused by the failure of an existing 13-inch by 22-inch corrugated metal arch storm drainpipe located along the property line between the homes at 2111 and 2117 Ildica Court.  The storm drain serves as a means of conveying flows from the local residential area to ultimately drain into an existing open channel servicing the Spring Valley area.  The site and facility needed immediate stabilization and repair. The contractor stabilized the site, built a temporary stormwater bypass, and installed a new storm drain pipe.  The estimated cost for the required work is $100,000.  The project was completed on February 28, 2024. 

On January 22, 2024, Flood Control field crews were monitoring an existing publicly maintained 36-inch storm drain inlet within the unincorporated community of Casa de Oro, California.  The inlet is located behind the residential property at 9602 Casa de la Torre Court.  Upstream of the inlet is an existing privately owned and maintained school district inlet at Murdock Elementary School which became overwhelmed and clogged due to the unprecedented rain event.  Mud and debris then overflowed from the school property and in turn caused a slope failure, which clogged the publicly maintained inlet downstream, then continued into a private residence and private pool. The publicly maintained inlet was buried by 6-8 feet of sediment and debris for a length of about 100 feet. The sediment and debris must be removed from the publicly maintained inlet, pipe and upstream channel to allow for proper drainage.  The estimated cost for the required work is $500,000. The project was completed on March 15, 2024. A future additional improvement project is pending the La Mesa-Spring Valley school district’s plan to repair the slope failure.  Once the slope work is completed by the school district, the remaining improvements can be completed through the competitive bid process.

 

On January 25, 2024, the District was notified that a sinkhole formed at 3150 Rio Way within the unincorporated community of Spring Valley, California.  The sinkhole was caused by the failure of an existing 36-inch corrugated metal storm drainpipe that travels along the back property line of 3150 Rio Way. The storm drain serves as a means of conveying flows from Lamar Street drainage system to the concrete channel north of Lamar Street servicing the Spring Valley area.  The site and facility needed immediate stabilization and repair. The estimated cost for the required work is $300,000. The project was completed on March 13, 2024.

 

On January 29, 2024, the District was notified that a sinkhole formed at 4362 Edgewood Court within the unincorporated community of Casa de Oro, California. The sinkhole was caused by the failure of an existing 42-inch corrugated metal drainpipe that travels along the property line of 4362 Edgewood Court. The sinkhole spread from 4362 Edgewood Court to 4368 Edgewood Court. The storm drain serves as a means of conveying flows from upstream residential areas and public roads. The site and facility needed immediate stabilization and repair. The cost for the required work was initially estimated to be $500,000. Further investigation of the site has revealed additional damages and repair challenges that will require extensive excavation to replace the storm drain between the foundations of two homes, a swimming pool, a public sanitary sewer line, and other public utilities. These additional items of work have increased the estimated costs by $2,300,000 to a revised total of $2,800,000.  As of March 18, 2024, the project is approximately 13% complete. To date, the contractor has been provided temporary sewer lateral design and details and began mobilizing temporary sewer materials to the site. The project is estimated to be completed by September 2024.

 

 

 

 

On February 6, 2024, the District investigated a sinkhole that formed behind a curb inlet along the storm drain alignment adjacent to the driveway of 9825 Dogwood Lane within the community of Hidden Meadows (unincorporated Escondido), California. The sinkhole required immediate repair due to the failure of the storm drain. The final cost for the required work is $11,456.37.  The project was completed on February 12, 2024.

 

On February 13, 2024, the District investigated a sinkhole that formed behind the headwall of the storm drain facility in the parking lot of 8575 Los Coches Road within the community of Lakeside (unincorporated El Cajon), California. It required immediate repair due to the failure of the storm drain. The estimated cost for the required work is $750,000.  The notice to proceed was issued on February 15, 2024, and work began the following day.  As of March 18, 2024, the project is 30% complete. The contractor relocated utilities, excavated the culvert pipe and begin replacing the first culvert pipe.  The project is estimated to be completed by the end of April 2024.

 

On February 19, 2024, the District was notified that large voids had formed around an existing concrete storm drain inlet apron at 2544 Buena Flores within the unincorporated community of Fallbrook, California.  The voids were caused by significant scouring and erosion that completely undermined the inlet apron.  The inlet apron serves as a means of capturing flows from an upstream natural stream east of 2544 Buena Flores and conveying them into an existing 48-inch reinforced concrete pipe (RCP) network that ultimately drains to another natural creek further to the west.  The facility and surrounding area need immediate stabilization and repair.  The estimated cost for the required work is $500,000.  As of March 18, 2024, the project is 10% complete.  To date, the contractor has completed clearing and grubbing the access route, removed fallen trees and installed a construction entrance and various BMPs. The repairs are estimated to be completed by the end of April 2024.

 

On March 11, 2024, the District was notified that sinkholes that formed at the back yard of 402 Potter Street within the unincorporated community of Fallbrook, California. Failure of the storm drain required immediate repair, and the site was secured with caution tape at the sinkhole locations. The estimated cost for the required work is $500,000.  The notice to proceed was issued on March 19, 2024, and work began the following day. The project is estimated to be completed by the end of April 2024.

 

There is an elevated risk to public health and safety if the immediate emergency repair work is not continued and finished. This letter updates the Board on the status of repair work at all of the previously approved eight emergency locations, includes a recommendation to continue emergency contract work at three locations where work is ongoing as necessary to complete this effort.

 

 

 

 

 

ENVIRONMENTAL STATEMENT

Section 15269 of the California Environmental Quality Act (CEQA) Guidelines exempts from CEQA review actions consisting of the “emergency repairs to publicly or privately owned service facilities necessary to maintain service essential to the public health, safety or welfare.” The proposed projects involve emergency repairs and replacement of publicly maintained storm drain culverts that have failed and created sinkholes and other unsafe conditions on private and public property. The proposed emergency repairs are necessary to maintain services essential to protect public health and safety and, therefore, are statutorily exempt from CEQA pursuant to Section 15269(b) of the State CEQA Guidelines.

 

LINKAGE TO THE COUNTY OF SAN DIEGO STRATEGIC PLAN

Today’s proposed actions support the Sustainability Resiliency and Community Safety Strategic Initiatives in the County’s 2024-2029 Strategic Plan.  These emergency repairs will restore function of the storm drain systems and eliminate the existing hazard, which will reduce the future flood hazards and allow the residents to be able to fully use the affected properties and roadways safely.

Details

 

 

 

 

Respectfully submitted,

 

 

 Dahvia lynch

Interim Deputy Chief Administrative Officer

 